Brand new 20,000 square foot freezer with attached thawing room and cooled vestibule.
Ground up construction of (3) new bars at a soccer stadium. Consisted of concrete poured in place elevated deck for expanded fan capacity.
Removed aged score board and installed new state of the art curved LED scoreboard that included major grading, foundation, utility work along with the install of the scoreboard itself.
Fabricated and permanently installed scarf built of structural steel, foam, fiberglass, with a vinyl wrap for corporate branding.
AZ
CA
UT
ROC 339300
918675
12945576-5501